Production

CONCRETE

Production of Domestic Sewage Treatment Systems and rain water tanks is carried out in our yard at Yatala. From this base we service the market for Sewage Treatment plants and Rain Water Tanks in South East Queensland and beyond.

Quality Tanks follow strict production process to ensure that the rain water tanks and sewage treatment plants are of the highest quality and require little maintenance.

Pre mix concrete is used to form the domestic sewage treatment systems and rain water tanks. The concrete is poured into the moulds that have been fitted out with steel reinforcing. Once the tanks have cured, the sewage treatment plants are fitted out ready for installation, servicing homes and business’s that do not have town sewage connection.

POLYMER

Allways Polytec Pty Ltd are pleased to accounce the NEW arrival and aprroval of our plastic sewage treatment plant. We now manufactrure at our factory in Yatala our Krystel Kleer Poly ADV5000 Domestic Sewage Treatment System along side our range of Poly rain water tanks. All our poly rain water tanks and plastic septic tanks are made with high grade polyethelene . The Krystel Kleer Poly ADV5000 (plastic septic tank)  has been approved by Queensland - Approval no. 23/2010 and will soon be available in others States and Territories. 

Gallery

+ Click on a photo below to enlarge


Rain Water Tanks & Sewage Treatment Plants Production Yard

Concrete Rain Water Tank Precast Mould

Preparing Mould ready for Rain Water Tank Production

Concrete Tank Pour

Production




Crane Truck ready for delivery

Rain Water Tank ready for Transportation

Transport Truck